Advisory, development, and execution.
Assessment and use-case fit up front, site development and equipment procurement in the middle, execution through close and into build. Deals are typically structured on a hybrid model with promote and capex success fee.
01 / Advisory
Advisory
What we do before a site is ready to transact.
-
Site assessment
A structured review of the site, the power profile, and the interconnect position that will shape any deal.
-
Use-case strategy
A practical match between the site’s power shape and the workload — inference, training, or mining.
-
Commercial structuring
Shaping the path to a signed deal with a hybrid commercial model — promote and capex success fee — across offtake, PPA, JV, or operator partnership.
02 / Development
Development and procurement
The site, the grid connection, and the long-lead equipment between the substation and the rack.
Full scope-
Land and site development
Sourcing, optioning, and closing on land for AI campuses — then the civil, water, fiber, and permitting work that makes it buildable.
-
Utility, BTM/FTM, and interconnect
Negotiation with the utility and the ISO on hybrid behind-the-meter and front-of-the-meter arrangements, interconnect terms, and queue position — so on-site generation and firm grid availability work together.
-
Electrical, turbines, and on-site generation
Procurement of power transformers, HV and MV switchgear, UPS and distribution, gas turbines, engines, standby generation, and battery storage.
-
Cooling and mechanical
Chillers, dry coolers, cooling towers, CDUs, direct-to-chip, and immersion — matched to rack density, water, and the power budget.
03 / Execution
Execution
The work that carries a signed deal through close and into build.
-
Expediting, logistics, and acceptance
Hands-on support on the import and export side of a buildout: factory tests, freight, delivery to the pad, and site acceptance.
-
EPC oversight and financing support
Boots on the ground when needed — managing EPC delivery and helping source financing so the project moves from term sheet to construction.