Assess, match, structure
Whether the site is buildable for compute, which workload fits, and a structure both sides can sign.
- Site assessment
- Use-case strategy
- Commercial structuring
We originate, structure, and develop 100 MW to 3 GW hydro, wind, and solar sites for AI inference, training, and mining — from the first site review to the equipment on the pad.
Power is the constraint. We take a site from
generation to
compute
— and source the
electrical,
turbines, and
cooling in between.
Services
Advisory up front, development and procurement in the middle, execution through close and into build. Engage one practice or all three.
Whether the site is buildable for compute, which workload fits, and a structure both sides can sign.
Land, interconnect, and the long-lead equipment between the substation and the rack.
Boots on the ground when the project needs them — from term sheet to energization.
New — Development & procurement
On many AI builds the critical path is a transformer, a switchgear lineup, or a turbine slot — not the GPUs. We run the site work and the long-lead procurement so the schedule holds.
See the scopeWho it is for
Process
Site, capacity, and constraints. NDA first.
The technical and commercial case. Go or no-go.
Terms both counterparties can underwrite and sign.
Site work, long-lead equipment, and EPC through energization.