Scope
Six layers, from the ground up.
Engage on one layer or the whole stack. Each starts from the same basis of design, so the equipment, the site, and the deal describe the same campus.
01
Site development Optioned with the land and finished before the long-lead orders land, so equipment has a pad to sit on.
Land control, title, and easements Grading, foundations, and roads Stormwater, water supply, and discharge Fiber routes and rights-of-way Permits and environmental review 02 Long-lead
Substation and interconnect Usually the longest-lead, highest-cost item on an AI campus. A signed offtake still needs a transformer strategy.
GSU and station power transformers HV breakers, disconnects, and GIS or AIS switchgear Protection, relay, and metering panels Transmission tie-line and utility-side upgrades Spare transformer strategy 03 Long-lead
Turbines and on-site generation Bridge power while the interconnect is built, standby for availability, or prime power behind the meter. Turbine slots are reserved years out.
Gas turbines — aeroderivative and industrial frame Reciprocating engine gensets Standby diesel or gas generators Battery energy storage (BESS) Wind and hydro turbine supply for the renewable side 04 Long-lead
Electrical distribution Medium-voltage gear is globally tight. It is ordered against the single-line diagram, not the final hall layout.
MV switchgear and ring main units Unit substations and pad-mount transformers LV switchboards and paralleling gear UPS — static and rotary Busway, RPPs, and high-density PDUs MV cable and duct bank 05 Long-lead
Cooling and mechanical Rack density sets the cooling choice; the cooling choice sets water, power, and capex. CDUs and large chillers are long-lead at scale.
Chillers — air- and water-cooled Dry coolers, adiabatic coolers, and cooling towers CDUs and secondary fluid loops Direct-to-chip manifolds and rear-door heat exchangers Immersion tanks and fluid Cooling guide 06
Controls and commissioning Factory and site tests are where late equipment and spec gaps surface. Witnessed early, they stay off the critical path.
EPMS, BMS, and monitoring Fire detection and suppression Security and access control Factory acceptance tests (FAT), witnessed Site acceptance and integrated systems testing